Factories

Building a Factory in Turkey: A Security Roadmap

A security roadmap for foreign investors building a plant in Turkey: construction, commissioning and operation, OSB rules, the governor's permit and budget.

Titan SavunmaOriginal Article: Updated: Approximately 8 min read
A private security officer using a radio in front of a wire fence.
In This Article

A foreign investor building a plant in Turkey usually meets the security question three times: when the land is fenced and the contractor moves in, when equipment arrives and commissioning starts, and when the plant runs on shifts. Each phase has different risks, different people in charge and, often, a different legal basis for the guards on site. Planning them as one continuous arrangement saves money and avoids gaps at the handover points.

This article walks through the phases, the organised industrial zone (OSB) rules that shape them, the private security permit under Law No. 5188 and the budget lines to expect. It is general information, not legal advice. Decisions for a specific site should be confirmed with the governor's office, the OSB directorate and your own counsel.

Start with who decides what

Three authorities matter most for a new plant inside an OSB.

  • The OSB itself. Under Article 4 of Law No. 4562, permits for land use, design, construction and use of buildings, as well as workplace opening and operating licences, are issued and supervised by the OSB within the zoning plan.
  • The governor's office. Under Article 3 of Law No. 5188, setting up an in-house security unit or having a security company provide the service requires the governor's permission, following a decision of the provincial private security commission.
  • The Ministry of Interior. The security company you hire must hold an activity licence from the Ministry (Art. 5). This is the company's licence, not a permit for your site.

Investors from abroad sometimes assume that hiring a licensed company is enough. It is not. The site permission under Article 3 is a separate decision, made for your premises and your risk profile.

Phase 1: land and construction site

Once a parcel is allocated, the site is usually an open field with a few containers. Typical risks are theft of cable, fuel and steel, unauthorised dumping, and people walking onto an active work area. During this period the main contractor often controls the site day to day, so the first decision is contractual: who is responsible for security, and in whose name will any private security permit be requested?

OSB rules affect the physical layout from day one. The OSB Implementing Regulation makes garden and retaining walls subject to OSB approval and leaves walls between neighbouring parcels to the participants concerned (Art. 43). Structures built without a permit or contrary to it can lead to a 30-day correction notice and, if not fixed, referral to the municipality or governorship (Art. 44). A temporary fence or gatehouse should therefore be agreed with the OSB rather than simply installed.

Practical points for this phase:

  • Agree one entry point for people and vehicles, with a simple log of who enters and what leaves.
  • Keep high-value materials in a lockable compound close to the gate, not scattered across the plot.
  • Decide early whether the contractor's guards or your own provider will cover nights and weekends, and write the boundary of responsibility into the contract.
  • Remember that occupational health and safety on the construction site remains the contractor's and employer's duty; guards support it but do not replace it.

Phase 2: commissioning

Commissioning is the phase most often under-planned. Expensive equipment is on site, many outside teams arrive for short periods, and the building is not yet fully secured. Foreign technicians may not speak Turkish, and the local team may not yet know who is authorised to be where.

A short written access plan helps: which zones are open to which teams, who signs off on temporary badges, where tools and spare parts are stored, and who receives deliveries outside working hours. If a permanent security arrangement is intended, this is the time for the application to be in progress, so that the permitted service is ready when the plant starts to operate.

Phase 3: operation

Once production starts, the security service settles into a routine: gate control, vehicle and goods checks, patrols, alarm response and visitor handling. The private security commission can determine the maximum number of personnel, the maximum quantity and type of weapons and equipment and, where necessary, other physical and technical security measures (Law No. 5188, Art. 3).

Several rules in Law No. 5188 matter to a foreign-owned operator:

  • Officers may use their powers only while on duty and within their duty area (Art. 9). The duty area should be clear on a site plan.
  • Private security officers must be Turkish citizens (Art. 10). An expatriate security manager can lead the function, but cannot be employed as a private security officer.
  • Weapons and equipment used in the service are supplied by the client, and security companies cannot buy or hold firearms except in limited cases approved by the commission and governor (Art. 8). If armed guarding is considered, the cost and licensing sit with you.
  • Where fifteen or more officers are employed, at least one security supervisor is designated (Art. 5).
  • The company notifies the governor's office in writing by the end of working hours on the day the service starts, and gives the client copies of officers' work permits within one month (Art. 5).

The operating plant also needs an emergency plan under the Regulation on Emergency Situations in Workplaces, with trained support staff for firefighting, rescue and protection, and drills at least once a year. The security team usually plays a central role in that plan, so its duties should be written into both documents in the same words.

The private security permit, step by step

The commission is chaired by a deputy governor and includes representatives of the provincial police, provincial gendarmerie and the chambers of commerce and industry. The applicant's representative attends the relevant meeting as a member (Law No. 5188, Art. 4). In practice, the file should explain what is being protected, the site boundaries, working hours, the proposed number of officers, whether weapons are requested and which technical measures exist.

A few points help the process:

  1. Decide whether the applicant is the investor's Turkish company, a tenant or another entity. Law No. 4562 allows participants to lease their facilities for production to one or more tenants (Art. 18), so on leased premises this question must be answered explicitly.
  2. Prepare a site plan showing gates, fences, patrol routes and camera locations.
  3. Align the request with the OSB's own security arrangements, so that zone patrols and plant guards do not overlap or leave gaps.
  4. Build the permit timeline into the project schedule. We do not quote a standard processing time, because it depends on the province and the commission's calendar; ask the governor's office early.

Ending a permanent arrangement is also regulated. Outside temporary cases, it can be ended by commission decision and governor's approval, provided an application is made at least one month beforehand (Art. 3).

What to budget, and when

PhaseTypical budget linesDecision owner
Land and constructionTemporary fence and gatehouse (with OSB approval), lighting, night guarding, material compoundInvestor and main contractor
CommissioningTemporary access control, badges, extra patrols during equipment delivery, storage securityInvestor project team
OperationGuarding service, CCTV and access control, alarm monitoring, emergency equipment, training and drillsPlant management
OngoingOSB management dues, which apply whether or not you use zone services (Law No. 4562, Art. 16)Plant management

Two items are often missed. First, alarm monitoring centres need a qualification certificate from the governor's office (Law No. 5188, Art. 5), so ask any monitoring provider for it. Second, OSB dues do not fall automatically because a plant buys its own guarding; the two costs are separate.

Where gaps usually appear

In plans of this kind, the weak points are rarely about headcount. They sit at the points where one arrangement ends and the next begins.

  • Contractor demobilisation. When the main contractor's scope closes, its night guards leave with it. If the operating service is not yet permitted, the site can be unguarded for days, often while the most valuable equipment is being installed.
  • Partial occupancy. Offices and the canteen may be in use while the production hall is still a construction area. Two sets of rules on one site confuse visitors and staff unless the boundary is marked and explained.
  • Headquarters standards. Group security standards written abroad may ask for measures that Turkish law assigns to specific authorities, or may not mention the governor's permit at all. Local instructions should translate the intent into what is lawful and permitted in Turkey.
  • Neighbours and the zone. An OSB is a shared environment. Agreeing early with the zone directorate on gate traffic, patrol routes and incident reporting prevents disputes later, especially at shared boundaries.

A simple way to close these gaps is a one-page transition plan for each handover, listing the date, who is responsible before and after, which keys, badges and records change hands, and who confirms that the new arrangement is in place.

A short checklist for investors

  • Who is responsible for security in each phase, and is it in the contracts?
  • Have fences, gatehouses and walls been agreed with the OSB?
  • In whose name will the Article 3 permit be requested, and when?
  • Does the security company hold a Ministry activity licence, and will it provide officers' work permit copies?
  • Are the security duties identical in the security instructions and the emergency plan?
  • Is there a clear handover date between the construction-phase arrangement and the operating service?

Titan Savunma is a private security company licensed by the Ministry of Interior under Law No. 5188, based in Ankara and certified to ISO 9001, 14001, 45001, 22301 and 28000. For the scope of our services, see factory security and organised industrial zone security.

Sources and Further Reading

← Back to Security BulletinBack to Top
For Your Organisation

Let’s Discuss Your Security Needs

Tell us about your operations and expectations so we can define the appropriate service scope together.

Contact

Request a Security Proposal for Your Organisation

Tell us your facility type, location and general requirements. Together, we can define a service scope that suits your organisation.

Tell Us What You Need

Fields marked * are required.

What Happens Next

  1. Initial DiscussionWe respond within 15 minutes and clarify your requirements and facility details together.
  2. Service ScopeWe assess staffing needs and the working arrangements.
  3. ProposalWe prepare our proposal for the agreed service scope.

General Directorates

Ankara · Çankaya
İstanbul · Levent

Nine regional directorates · 81 provinces

Looking for a role? Visit our careers page