Construction Sites

Wind Turbine Components: Port-to-Site Security in Turkey

Blades, nacelles and towers between a Turkish port and a remote laydown yard: custody handovers, escort law, cable theft and the records insurers ask for.

Titan SavunmaOriginal Article: Updated: Approximately 8 min read
A truck on the road at dusk with an accompanying passenger vehicle.
In This Article

This article is general information, not legal advice.

The most exposed weeks in a Turkish wind project are often not the operating years but the construction window, when blades, nacelles, hubs, tower sections and cable drums travel from a port to a hillside laydown area and wait there for the cranes. Security for this phase works best when it is planned as a chain of custody with four links: port storage, road movement, laydown and staging, and handover to the erection contractor and later to operations.

The main risks are not dramatic. They are damage that nobody records, missing small parts and tools, fuel and cable theft, and gaps in responsibility at each handover. The checklist below is written for developers, owners' engineers and foreign investors who need to know what to ask their logistics provider, EPC contractor and security provider before the first vessel arrives.

Where the risk sits in the chain

StageTypical exposureWho usually controls it
Port storageHandling damage, unclear custody, accessories separated from main componentsPort operator and freight forwarder under their contracts
Road movementAccidents, overnight stops, tampering with loose itemsHaulier, under a special permit and traffic authority control
Laydown and stagingTheft of cable, fuel, tools and small parts; weather and handling damageEPC contractor or turbine supplier, depending on the contract
Erection and handoverCopper theft from installed but unenergised cable, records gapsEPC contractor, then the owner or O&M contractor

The right-hand column is the point of the exercise. Security cannot fix a chain in which nobody knows who owns a blade on a given night. Before mobilisation, write down for each stage who has custody, who decides on security measures and who receives incident reports.

Port storage and the first handover

Components usually sit in a port or a nearby storage yard for days or weeks. Port security is the port's responsibility, but your interest starts before the trailer leaves. A good handover includes a joint visual inspection, photographs of each component with its serial number, a check that accessory boxes and bolt sets match the packing list, and a signed custody document. Blades deserve particular attention because surface damage may be invisible from a distance and becomes a dispute later.

If your security provider is asked to attend, define its role as observing and recording the handover, not taking custody in the port area. Port and marina environments have their own access and security regimes; see our note on port and marina security for how private security fits around them.

Road movement: who escorts, and on what legal basis

Oversized and overweight loads in Turkey need a permit from the General Directorate of Highways (Karayolları Genel Müdürlüğü, KGM) under Article 33 of the Highway Traffic Law No. 2918. A 2026 amendment (Law No. 7574) added that the procedures for these permits are set by regulation of the Ministry of Transport and Infrastructure after consulting the Ministry of Interior, and that traffic police support may be obtained for special loads. In other words, controlling traffic around a convoy is the job of the haulier's permitted escort arrangements and the traffic authorities.

Private security officers have no power to stop or direct public traffic. Law No. 5188 limits their powers to duty hours and their assigned duty area (Article 9). The same article treats the route as the duty area in route-based situations such as transporting cash and valuables, and allows the duty area to be extended by the provincial private security commission in necessary cases. Whether a guard vehicle may accompany a component convoy, and under which permit, is therefore a question your provider should put to the governorship (valilik) before the first movement, not decide on the road.

In practice the realistic security contribution during road movement is planning-level: agreeing overnight stops with the haulier at locations that are lit and controlled, briefing drivers on what to report, keeping a movement log and having the laydown team ready to receive at the expected time.

Laydown and staging areas

Laydown yards on wind sites are often on exposed ridges, far from towns, with poor mobile coverage and long access roads. Protection depends on simple fundamentals done consistently:

  • A defined compound with a single controlled entrance, fencing proportionate to the risk and lighting where power is available.
  • A live inventory by serial number, updated at every arrival and every issue to the erection crew.
  • Access control based on a contractor list maintained by the EPC, with visitor and vehicle records.
  • Patrol and observation routines that cover the yard, fuel storage and cable drum area, adjusted to shift patterns, working hours and legal working-time limits.
  • Weather awareness: strong wind can move packaging and light items; patrols should report loose covers and storm damage, not only intruders.

Several employers share a wind construction site: the EPC, the turbine supplier, civil and electrical subcontractors and the security provider. Law No. 6331 on Occupational Health and Safety requires employers sharing the same work area to cooperate, coordinate the prevention of occupational risks and inform each other about them (Article 23). For guards this means being included in the site induction, knowing lifting exclusion zones and never being asked to supervise crane or rigging work. More on construction-phase arrangements in our page on construction site security.

Copper and cable theft during construction

Cable drums and freshly laid but unenergised cable are the most attractive targets on a wind construction site. Research supports the idea that this pressure moves with metal prices. Studying copper cable theft from the British railway network, Sidebottom, Ashby and Johnson (2014) found that changes in copper prices moved in the same direction as the volume of thefts of live cable, a finding that supports the price-theft hypothesis. A site that was quiet last year can see more attempts when prices rise.

Measures that tend to work at planning level:

  • Keep drums in the controlled compound and issue them against a signed record, not by self-service.
  • Shorten the time between laying cable and backfilling or energising it; open trenches overnight are an invitation.
  • Reconcile cable issued, cable installed and offcuts every day, and store offcuts securely until they are formally disposed of.
  • Treat scrap handling as a controlled process, because insider-assisted theft often hides inside "waste removal".
  • Report every attempt, including failed ones, so the pattern is visible to the owner.

Handover to EPC and O&M, and the records insurers ask for

As turbines are erected and commissioned, custody shifts from logistics to the EPC contractor and finally to the owner or the operations and maintenance (O&M) contractor. Each shift should come with a security handover: open incidents, access lists to be closed, keys and codes to be changed, inventory reconciliation and a list of known weak points.

Insurers and lenders will ask for evidence when something goes wrong. The IFC good practice handbook on security forces includes a sample incident report summary that captures incident type, date, time and location, a description of what led up to the event, the people involved, the assessed consequences and the management actions taken. That structure works well for construction incidents too. Add photographs, the custody document of the relevant stage and, for theft, the reference of the report made to the police or gendarmerie. Notify the insurer within the period stated in the policy, and keep the original records unchanged.

Pre-mobilisation checklist

  1. Custody owner named for each stage, in writing.
  2. Port handover format agreed: inspection, photos, serials, signatures.
  3. Road movement permit and escort arrangements confirmed by the haulier; any private security role checked against the guard permit with the governorship.
  4. Overnight stops agreed in advance.
  5. Laydown compound, lighting, access list and inventory system ready before the first delivery.
  6. Cable issue and reconciliation process agreed with the electrical subcontractor.
  7. OHS coordination meeting held, with security included.
  8. Incident report format and insurer notification route agreed.
  9. Handover template ready for EPC to O&M transfer.

Once the farm is operating, the security questions change; road access during operations is a separate topic covered in our bulletin on wind farm access and temporary road closures.

About Titan Savunma

Titan Savunma is an Ankara-based private security company licensed by the Ministry of Interior under Law No. 5188, with ISO 9001, 14001, 45001, 22301 and 28000 certificates. We plan security for sites in different provinces with a single point of contact, written scope and regular reporting, in English and Turkish. See our approach to energy generation and distribution security.

Sources and Further Reading

← Back to Security BulletinBack to Top
For Your Organisation

Let’s Discuss Your Security Needs

Tell us about your operations and expectations so we can define the appropriate service scope together.

Contact

Request a Security Proposal for Your Organisation

Tell us your facility type, location and general requirements. Together, we can define a service scope that suits your organisation.

Tell Us What You Need

Fields marked * are required.

What Happens Next

  1. Initial DiscussionWe respond within 15 minutes and clarify your requirements and facility details together.
  2. Service ScopeWe assess staffing needs and the working arrangements.
  3. ProposalWe prepare our proposal for the agreed service scope.

General Directorates

Ankara · Çankaya
İstanbul · Levent

Nine regional directorates · 81 provinces

Looking for a role? Visit our careers page