Residual Risk

The risk that remains after all chosen controls have been applied; management decides whether it can be accepted.

Residual risk is the risk left over once security measures and controls are in place. The NIST glossary defines it as the portion of risk remaining after security measures have been applied. Because no control eliminates risk entirely, every security programme carries some residual risk.

Risk assessments usually record two values: the inherent (gross) risk, assessed as if no controls existed, and the residual risk reached with existing or planned controls. The gap between them shows how effective the controls are. Residual risk is then compared with the organisation’s risk appetite. If it is above that limit, options include further controls, insurance or changing the activity; if below, it is consciously accepted and monitored.

In Turkey, occupational health and safety risk assessment reports commonly show the risk level after controls. In security plans, too, formally accepting residual risk in writing makes it clear who is accountable for it.

Points to watch

  • Have residual risk formally accepted, in writing, by an authorised manager.
  • Do not record residual risk as low until controls are shown to work.
  • Review accepted residual risks at regular intervals.
  • Insurance transfers financial loss but does not remove the physical consequence.

Sources

  1. NIST CSRC Glossary — Residual Risk
  2. ISO — ISO 31000:2018 Risk management — Guidelines

Contact

Request a Security Proposal for Your Organisation

Tell us your facility type, location and general requirements. Together, we can define a service scope that suits your organisation.

Tell Us What You Need

Fields marked * are required.

What Happens Next

  1. Initial DiscussionWe respond within 15 minutes and clarify your requirements and facility details together.
  2. Service ScopeWe assess staffing needs and the working arrangements.
  3. ProposalWe prepare our proposal for the agreed service scope.

General Directorates

Ankara · Çankaya
İstanbul · Levent

Nine regional directorates · 81 provinces

Looking for a role? Visit our careers page