A data centre in Turkey is best laid out as a series of nested zones, each harder to enter than the one outside it: the site perimeter and vehicle approach, the gatehouse and car park, reception and the mantrap, the support corridors and plant areas, the white space with its data halls and customer cages, and the loading bay. People are placed where judgement is needed (the vehicle gate, reception and the loading bay); cameras, alarms and access control cover the rest; and a patrol joins the zones together, including the supply paths such as generator yards, fuel storage, cooling plant, the roof and cable entry points. That is the answer an investor or operator usually needs before choosing a site or reviewing a design.

The standards help you decide how strong each zone must be, but none of them hands you a floor plan or a guard roster. Those are planning decisions you make for the specific building, and in Turkey the people who staff the posts work under Law No. 5188 on Private Security Services. This guide works through the layout zone by zone and shows how to test it on a free browser-based simulator.

This article is general information, not legal advice.

Six zones from the fence to the rack

ZoneWhat happens thereTypical controlsRole of the security team
Site perimeter and approachFence line, access road, landscapingFence, lighting, perimeter detection, cameras, vehicle barriers where justifiedAlarm response and patrol; no fixed post on the fence line itself
Vehicle gate and car parkStaff, visitors, contractors, deliveries arriveBarrier, pre-notified vehicle list, separate visitor parking outside the inner lineVerify drivers and vehicles against the expected list; record arrivals
Reception and mantrapIdentity checks, badges, escortsVisitor management, interlocked one-person entry, walk-through and hand detectors where specifiedCheck identity against authorised lists before any credential is issued
Support corridors and plantPower, UPS, generators, fuel, cooling, roof, cable entryCard access by role, door alarms, cameras on entriesPatrol and alarm response; contractor escort
White spaceData halls, customer cages, meet-me roomsAdditional card or biometric layer, cage locks, rack-level controlsUsually no fixed post inside; escorts and response
Loading bay and stagingEquipment in and out, packaging, storageSeparate dock, staging room, door alarms, camerasMatch deliveries and removals to authorised tickets

What the standards actually say about layout

EN 50600-2-5 is the security part of the European EN 50600 series on data centre facilities. Its public preview (the 2020 enquiry draft of the current edition) shows how it is built: protection classes against unauthorised access, numbered 1 to 4, sit alongside separate protection classes against intrusion, fire starting inside data centre spaces and environmental events. The access clause has sub-sections on premises with and without external physical barriers, roofs, access routes, parking, employees and visitors, pathways, and cabinets, racks and frames, and a later clause covers security lighting, video surveillance, intruder and hold-up alarms, access control and alarm monitoring. In other words, the standard asks you to designate every space with a class and then build each boundary to match. That is a layout exercise.

ISO/IEC 27001:2022 is a management-system standard. Its Annex A includes physical controls such as physical security perimeters, physical entry and physical security monitoring, chosen on the basis of risk. It tells you to define and control perimeters; it does not tell you where to put them.

ANSI/TIA-942 is described by the Telecommunications Industry Association as setting requirements for the physical infrastructure of a data centre, with physical security listed as one topic next to site selection and facility layout, power, cooling, fire protection and monitoring.

For neutral wording in post orders, the US National Institute of Standards and Technology catalogue SP 800-53 Rev. 5 is free to read. PE-3 (physical access control) asks organisations to verify access authorisations before granting access, to control entry and exit with access control systems or guards, and to escort visitors. Its enhancement PE-3(3) describes guards at selected access points around the clock and notes that guards give a faster response and human observation where cameras do not reach. PE-6 covers monitoring physical access and reviewing logs; PE-16 covers authorising and recording equipment entering and leaving, noting that this may mean restricting access to delivery areas and isolating them from the system and media libraries. None of these documents sets a number of guards.

Vehicle approach and the perimeter

Most data centres need only one controlled vehicle entrance, with deliveries announced in advance and checked against a list at the gate. Visitor parking belongs outside the inner security line, so that an unknown vehicle never stands next to the building or the generator yard. Where the risk assessment calls for vehicle barriers, CISA's hostile vehicle mitigation guidance makes a point worth repeating to designers: mitigation cannot be one-size-fits-all, and it has to balance security with the operational needs of the people who use the site every day. For a data centre that includes fuel deliveries, generator maintenance vehicles and fire service access, all of which must still work after the barriers are installed.

The perimeter itself is usually covered by detection, lighting and cameras rather than people, with a patrol and an alarm response route. What matters for layout is that every alarm zone can be reached quickly by the team on duty and that the patrol route passes the supply paths, not only the front of the building.

Reception, the mantrap and the white space

Reception is where identity becomes access. The sequence should be fixed: check identity, compare it with the authorised list or ticket, issue a time-limited credential, and hand the visitor to an escort if required. An interlocked mantrap or similar one-person entry then separates the public side from the secure side. Screening with walk-through and hand detectors, if the operator specifies it, sits before the mantrap.

Inside, the white space normally has its own access layer. Colocation sites add customer cages and suites, and the tenant should know where the operator's responsibility ends and their own procedures begin. A fixed post inside a data hall is rarely needed; escorts, access logs that are actually reviewed (PE-6) and a short response time do more.

The loading bay: where layouts most often go wrong

Many designs put real effort into the front door and then let the loading bay open straight onto a service corridor that leads to the halls. A sound layout gives the dock its own door, a staging or unpacking room where equipment is checked against a ticket, and a separate, controlled route from staging to the white space. Removals deserve the same care as deliveries: drives and decommissioned equipment leaving the building should be matched to a record, in line with the logic of PE-16. When the dock is in use it should be supervised; when it is not, its doors should be closed and alarmed.

Guard posts, patrols and Turkish law

At planning level, think in posts that must be staffed at the same time, not in total people. A typical pattern has the gatehouse and reception continuously staffed, the loading bay staffed during delivery windows, and a patrol covering the perimeter, the plant areas and the roof. Night and weekend bands are different from the working day: reception may close, and the gate and the monitoring point carry more weight. How many people that means depends on the shift pattern, leave cover and working-time rules, and is planned site by site.

In Turkey, an operator that employs its own officers or contracts a licensed company needs the governor's permission after a decision of the provincial private security commission (Law No. 5188, Art. 3). Article 7(a) allows officers to pass people through walk-through detectors, search them with a detector and pass belongings through X-ray or similar systems at the areas they protect, and Article 9 limits officers' powers to their working hours and area of duty. Visitor registers, badge logs and camera footage are personal data, so Law No. 6698 (KVKK) applies: Article 10 on informing people and Article 12 on technical and administrative measures to keep data secure.

Testing the layout on the Security Digital Twin

Before a site survey, it helps to put the zones on a screen that the operator, the designer and the security provider can discuss together. Our free Security Digital Twin Simulator (data centre template) runs in the browser and sends no data. You enter floor area, floors, entrances and operating hours, and a schematic 2D plan and 3D view redraw as you type. You can place guard posts, a patrol route, cameras, X-ray, walk-through and hand detectors, turnstiles and barriers, or start from the suggested layout and move items around. The tool shows the guard posts suggested at the same time in each time band (day, night, weekend), a simplified camera coverage view and technology suggestions. It gives no prices and no headcount, and its drawing is schematic, not a site plan or a survey. To estimate coverage hours across several posts, the security coverage planner is the companion tool.

Common mistakes and a short checklist

  • Visitor parking next to the building or the generator yard.
  • A loading bay with a direct, uncontrolled route to the white space.
  • A patrol route that covers the front of the building but not the fuel, cooling and roof areas.
  • Access logs collected but never reviewed.
  • Barriers that block fuel delivery or fire service access.
  1. Designate every space with a protection level and draw the boundaries between them.
  2. Fix one controlled vehicle entrance and pre-notified deliveries.
  3. Write the reception sequence: identity, list, credential, escort.
  4. Give the loading bay a staging room and a controlled route to the halls.
  5. Decide which posts are continuous and which follow delivery windows, then plan staffing per site.
  6. Sketch the result on the data centre template and take the summary to the survey.

For the operational side, see our page on data centre physical security.

Titan Savunma is an Ankara-based private security company operating under a Ministry of Interior licence granted under Law No. 5188, with ISO 9001, 14001, 45001, 22301 and 28000 certificates. We work with international companies in English and Turkish and plan services for sites in different provinces with a single point of contact, a written scope and regular reporting. Read more about our work as a security partner for international companies in Turkey.

Sources and Further Reading

← Back to Security BulletinBack to Top
For Your Organisation

Let’s Discuss Your Security Needs

Tell us about your operations and expectations so we can define the appropriate service scope together.

Contact

Request a Security Proposal for Your Organisation

Tell us your facility type, location and general requirements. Together, we can define a service scope that suits your organisation.

Tell Us What You Need

Fields marked * are required.

What Happens Next

  1. Initial DiscussionWe respond within 15 minutes and clarify your requirements and facility details together.
  2. Service ScopeWe assess staffing needs and the working arrangements.
  3. ProposalWe prepare our proposal for the agreed service scope.

General Directorates

Ankara · Çankaya
İstanbul · Levent

Nine regional directorates · 81 provinces

Looking for a role? Visit our careers page