Short answer: on a large investment site in Sakarya, supervision is at its thinnest once the site empties: after the last staff bus leaves in the evening, when work stops on Saturday afternoon and over long public holidays. Those hours need three separate plans. Cable and metal stock should be locked, counted and kept in plain view; plant should be gathered in one lit area with no keys left on site; and the night and weekend routine should be written with its own rules rather than as a shortened version of the day shift. Below we explain how to build those three plans, drawing on Sakarya's official data and international research.
Why is site security a live issue in Sakarya?
Construction accounts for a sizeable share of insured employment in Sakarya. The 2025 yearbook of Türkiye's Social Security Institution (SGK) records 4,419 workplaces and 26,360 compulsorily insured employees in construction in the province: 18,633 in residential and non-residential buildings, 3,886 in civil engineering such as roads and utilities, and 3,841 in specialised trades such as electrical and mechanical installation. Across all sectors, the same yearbook shows 3,326 temporary workplaces in Sakarya employing 26,788 insured people. In short, the province has a large number of sites that will close once the job is finished, with thousands at work on them. (The totals are our own sums from the yearbook tables.)
Investment is still flowing. According to an Ekonomi Gazetesi report of November 2025, 219 firms applied for preliminary plot allocation in the roughly 224-hectare Söğütlü organised industrial zone, 78 received investment approval and 44 signed contracts; more than 10,000 jobs are expected at full capacity. In a zone like this, excavation, steel erection and electrical installation can run side by side on dozens of plots in the same year. Each plot has its own main contractor, its own subcontractors and its own working hours, but after dark they all face the same empty road.
On a large factory or warehouse project, the build phase can run beyond a year. What sits on site changes over that time: rebar and formwork at foundation stage, then cable, switchgear, pipework and HVAC equipment once the shell is up. That is why the security plan has to move with each phase of the work.
What does the research say?
The first two studies come from the United Kingdom; the two reviews pool evaluations mainly from the United States and the United Kingdom. We found no peer-reviewed research on night-time losses from Turkish construction sites, so read the findings as parallels from elsewhere rather than measurements for Sakarya.
Cable theft follows the metal price
Working with 76 months of police records (2006–2012) on "live" copper cable stolen from Britain's railways, a time-series study linked rises and falls in the copper price to rises and falls in the number of thefts (Sidebottom, Ashby and Johnson, Journal of Research in Crime and Delinquency, 2014). Two rival hypotheses were checked as well, swings in unemployment and theft of railway property more generally, and the results showed that cable theft did not follow the wider fall seen in most crime types. A decline in recent years was also observed, though the reason was unclear. The study is about railway cable, not building sites, and we report it from the abstract. The lesson for a site is still plain: cable on the drum, or pulled but not yet energised, turns quickly into cash, and night checks should be stepped up when metal prices rise.
The real damage is lost production
A survey of 220 UK building contractors, 51 of whom returned complete answers, asked what actually makes up the bill when a machine is stolen (Fadiya, Georgakis, Chinyio and Akadiri, Journal of Financial Management of Property and Construction, 2013). Respondents saw lost output and higher insurance premiums as the heaviest items. With so few replies, and with views rather than measured losses as the data, the result is a reminder rather than a measurement: one machine gone overnight can disrupt a crew's programme the next morning.
Cameras do more when watched and backed by other measures
Pooling forty years of evaluations, a systematic review with meta-analysis linked CCTV to a statistically significant, modest reduction in crime (Piza, Welsh, Farrington and Thomas, Criminology & Public Policy, 2019). It drew on 80 evaluations. Car parks showed the biggest and steadiest effects; systems watched live by an operator produced larger effects than passive recording, and schemes deploying several other measures alongside CCTV did better than those with a single additional measure or none. The authors advise focusing CCTV on vehicle and property crime and not using it as a stand-alone measure. A construction site is not a car park, but protecting vehicles and goods within a bounded area has much in common with one.
Lighting works in a different way from what you might expect
A Campbell systematic review pooling 13 evaluations from the United States and the United Kingdom found that improved street lighting significantly reduced crime in public areas (Welsh and Farrington, Campbell Systematic Reviews, 2008). The telling detail is that crime after dark fell no more than crime in daylight, so the authors suggest the effect may owe more to a sense that the area is cared for and to informal social control than to better visibility alone. The review concerns streets, so it should be applied to sites with care. Our reading: a well-lit, orderly site signals that someone is in charge; a dark, neglected one signals the opposite.
Three plans: materials, cable and plant
| Asset | Before nightfall | Night and weekend checks |
|---|---|---|
| Cable, switchgear, copper pipe | Drums moved into a locked container or fenced compound; deliveries timed close to the date of use; runs that are pulled but not yet energised listed with the site manager. | Container seal and lock check, a walk along ducts and cable routes, any open cover or cut run reported to the site's own manager. |
| Rebar, sections, formwork | Stock yard kept visible from the gate and the road; nothing leaves without a dispatch note. | The yard perimeter, any obvious drop in a stack, unusual vehicle tracks. |
| Plant and generators | When work stops, plant is parked together in one lit area; keys handed over against signature; fuel tanks locked. | Count against the plant list, lighting at the parking point, fuel tank lock status. |
| Shared areas | Site cabins, tool stores and lighting masts checked at the start of each shift. | Whether camera recordings can be reached, what goes down in a power cut, who is told. |
Some tasks in the table, such as stock counts and delivery sign-off, belong to the site's own staff; the security officer does not do them, but records and reports what he or she sees.
The night routine: long, wet evenings in a Sakarya winter
Turkish State Meteorological Service statistics for 1951–2025 show December as Sakarya's wettest month (106 mm on average), with more than 15 rainy days a month on average in December and January. The January mean is 6.3 °C, the lowest recorded temperature −14.5 °C and the greatest recorded snow depth 54 cm (2008). Winter in Sakarya therefore usually means early darkness, rain and mud rather than deep cold. That creates practical problems on site: mud hides vehicle tracks, rain undermines the base of fences and damp brings lighting and camera connections to fault.
- Closing walk: the officer taking over for the night walks the site with whichever site supervisor leaves last; container locks, plant keys and the fuel tank all go on one closing record.
- Lighting list: which floodlight comes on when, which one is faulty and who is told; a dead lamp is reported the same night, not the next day.
- Round order: patrols do not follow the same order at the same time every night, but the cable store, the plant park and the weakest corner of the perimeter are seen on every round.
- After heavy rain: fences, gates and temporary lighting masts get an extra check.
- Conditions for officers: a dry booth, waterproofs and rotating duties for outdoor posts on wet nights are agreed before the service starts.
The weekend and holiday routine
What makes weekends hard is that the site is rarely completely empty. Some crews work on Saturday, a subcontractor pours concrete on Sunday, a supplier wants to drop off a load while passing. That mix blurs who is supposed to be on site.
- On Friday the site manager gives security a written list of the firms and vehicles due on site over the weekend; a vehicle not on the list waits until a site manager approves it.
- No valuable deliveries on Friday afternoon or on the eve of a public holiday; if one is unavoidable, a site manager is present.
- Before long holidays, list the plant and materials staying on site, and count against the same list on return.
- Talk to the neighbouring plots: in an industrial zone, a contractor working weekends next door affects how visible your site is. If the zone management runs its own security arrangements, agree the night and weekend reporting chain with them.
Business continuity in an earthquake zone
Sakarya lies in an earthquake zone, so a site security plan should also carry an emergency and business continuity section. After a tremor work may stop, workers may leave and the site can suddenly be left unwatched. What should be written down in advance: assembly point and headcount, who may and may not enter, checks on plant and fuel, how cameras and lighting run during a power cut, and an entrance kept clear for rescue and fire vehicles. We recommend testing these steps in a drill.
Common mistakes
- Leaving cable drums where they were unloaded, often at the roadside.
- Forgetting cable runs that are pulled but not yet energised.
- Installing cameras that nobody watches and whose faults nobody notices.
- Agreeing the weekend vehicle list verbally.
- Not reviewing fences, gates and lighting as the build moves on.
- Expecting security officers to take in deliveries or keep timesheets.
Notes for operating in Türkiye
A project owner or contractor that wants an outside firm to guard its site needs a permit issued in its own name. Law No. 5188 (Article 3) leaves that decision to the provincial private security commission and the governor's approval, so in Sakarya the file is lodged with the Governorship of Sakarya. Article 16 limits officers to protection and security duties alone; counting stock or signing for loads is therefore a job for the contractor's people. CCTV footage in which people can be identified, and gate logs of vehicles and visitors, contain personal data, so they must be kept in line with Law No. 6698. For the detail, your own lawyers should advise.
For the wider picture, see our page on construction site security; to sketch the cover a site may call for, try the security coverage planner.
Titan Savunma is an Ankara-based private security company licensed by the Ministry of Interior under Law No. 5188 and certified to ISO 9001, 14001, 45001, 22301 and 28000. We work with international companies in English and Turkish, and our Sakarya City Manager, supported by our Marmara Regional Directorate and our Istanbul General Directorate, plans the night, weekend and holiday routine for your site; see our page on private security in Sakarya. If you would like to talk it through, reach us via our contact page.
Sources and Further Reading
- Sidebottom, A., Ashby, M. & Johnson, S.D. — Copper Cable Theft: Revisiting the Price–Theft Hypothesis, Journal of Research in Crime and Delinquency 51(5):684–700 (2014)
- Piza, E.L., Welsh, B.C., Farrington, D.P. & Thomas, A.L. — CCTV surveillance for crime prevention: A 40-year systematic review with meta-analysis, Criminology & Public Policy 18(1):135–159 (2019)
- Welsh, B.C. & Farrington, D.P. — Effects of Improved Street Lighting on Crime, Campbell Systematic Reviews 4(1):1–51 (2008)
- Fadiya, O.O., Georgakis, P., Chinyio, E. & Akadiri, P. — Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft, Journal of Financial Management of Property and Construction 18(2):128–141 (2013)
- Sosyal Güvenlik Kurumu — SGK İstatistik Yıllığı 2025 (Sigortalı ve İşyeri İstatistikleri, Tablo 1.11 ve 1.17, Sakarya)
- Meteoroloji Genel Müdürlüğü — Resmi İstatistikler: Sakarya (1951–2025)
- Ekonomi Gazetesi — Söğütlü OSB'de 78 firma yatırım onayı aldı (13.11.2025)
- 5188 sayılı Özel Güvenlik Hizmetlerine Dair Kanun — Mevzuat Bilgi Sistemi