Short answer: on a road, infrastructure or building site in Yozgat, the most vulnerable time is when work stops: in the evening, at weekends, over public holidays and when the site winds down for winter. Research from other countries points to three things. Theft may often be the work of people who know the site, the delivery schedule and where the machines are parked; contractors see lost production, not the price of what was taken, as the biggest cost; and the most common measures (fencing, locks, inventories) may not be enough on their own. A sound site security plan deals with materials, fuel and plant separately, plans the empty hours in their own right and writes the winter shutdown into the contract from day one.
Why construction site security matters in Yozgat
Construction is one of Yozgat's largest employers. In the Turkish Social Security Institution's 2025 statistical yearbook, the construction branches account for 11,732 of the province's compulsorily insured workers, or 24.4% of the total. Of these, 4,784 are registered at 83 workplaces building roads, infrastructure and other non-building structures; measured against all local jobs, that branch weighs roughly five times what it does nationally. Temporary workplaces tell a similar story: the yearbook lists 1,229 of them in Yozgat, with 14,148 insured workers between them, so close to 29% of the compulsorily insured are on sites that shut once the project ends. (We derived the ratios from the yearbook tables.)
A temporary workplace is a site where security has to be built from scratch for every project. The gate routine, lighting and cameras that settle in over years at a permanent factory are usually missing; the perimeter moves as the work advances, the materials yard is relocated and plant is spread along the route.
The climate changes the picture too. In the Turkish State Meteorological Service statistics for 1929–2025, January in Yozgat averages −1.6 °C, with daily minimums averaging −5.2 °C over the month; the coldest reading on record is −24.4 °C, and snow has lain as deep as 92 cm. December is the wettest month. In these conditions many sites may slow down or stop, and for weeks a site can be left with nothing but plant, materials and fuel.
What does the research say?
The studies below come from the United States, the United Kingdom and Malawi; we could not find a peer-reviewed study measuring construction site theft in Türkiye. Read them as examples of the same problem elsewhere, not as measurements for Yozgat.
The thief often knows the site
In Port St. Lucie, Florida, a project run by police and university researchers examined all 266 thefts reported from single-family home construction sites in 2004 (Boba and Santos, International Journal of Construction Education and Research, 2007). The items stolen most often were building supplies (19.5%) and appliances (16.9%); counting supplies, equipment, rebar and ladders together brought the share to 33.8%. Data for the second half of the year showed that just over half of the thefts took place in the final stage, when the house could be locked, and around half required the highest level of skill. From this the researchers concluded that "insiders" who knew the work (for example subcontractors or those making deliveries) were the main offenders, a conclusion also based on the experience of police, builders and the city building department. Only 1.9% of cases ended in an arrest.
The second key finding was that risk might depend more on management practice than on the site: 20% of builders accounted for 69.2% of reported crime. The worst-hit builder's site supervisors were each managing 25 to 30 homes; this was cut to 15, appliance installation was delayed to the final stage and more care was taken over property left on site. The builder's incidents then fell markedly. This was a practical evaluation, not a controlled experiment, and the authors say their analysis was simple. Our takeaway: supervision load, delivery timing and protecting property left on site deserve attention before technical measures such as cameras.
The most common measures may not be the most effective
A survey of 40 large contractors in Malawi measured how often 44 security practices drawn from the literature were used (Simukonda and Kamwela, Journal of Construction Business and Management, 2021). The most common was keeping an inventory of materials, tools and plant; reducing the number of entrances, locked gates and container storage also ranked highly. Locking points to immobilise idle plant, tracking devices and hidden ignition cut-outs were used only "sometimes", and CCTV, electronic entry systems and alarms came last. Locks on fuel and oil tanks were "often" used. The study measures how often practices are used, not whether they work. In the authors' literature review, theft and vandalism on construction sites happen mainly in the evening and at night, vandalism rises at weekends, and a site after hours is likened to a "ghost town". These findings are reported from other studies.
The real cost is lost production
A survey answered by 51 UK building contractors compared how contractors perceive the components of the cost of plant theft (Fadiya and colleagues, Journal of Financial Management of Property and Construction, 2013). Among replacement, hire, labour, administrative and social costs, the two largest were loss of output and higher insurance premiums. The sample is small (51 full responses from 220 firms) and we report it from the abstract, but it confirms what every site manager knows: a missing excavator stops the programme until a replacement arrives.
An earlier case study in the same journal describes plant thieves as "audacious and determined" and argues that plant security and recovery technologies are not being adopted as widely as they should be to offset the problem (Edwards and Holt, 2008). It is a qualitative study based on descriptive case data and practitioners' accounts, without a statistical sample.
A checklist for a site in Yozgat
| Area | What happens on site | What is recorded |
|---|---|---|
| Materials | Steel, cable, pipe and other valuable materials arrive only when needed and are kept in a locked container or fenced compound; the contractor's own team signs for deliveries. | Entries to and exits from the materials yard, what the night round found. |
| Fuel | Fuel tanks and drums locked; plant tanks not left fuller than needed at the end of the day; tanker arrivals notified in advance. | Tanker registration, arrival time, tank lock status. |
| Plant | At the end of the day plant is gathered in a lit, visible spot; keys never left on site and handed over against signature; tracking devices and cut-outs, where fitted, checked as working. | Plant list and serial numbers, parking point, key issue and return. |
| Vehicle entry | A single vehicle entrance; no materials leave without a dispatch note; subcontractor and supplier vehicles logged. | Registration, company, driver, time, load. |
| Empty hours | A separate patrol plan for evenings, weekends and public holidays; perimeter and lighting checked at the start of each shift. | Round times, gaps found, who was told. |
| Winter shutdown | Shutdown date, list of plant and materials staying on site, reduced but unbroken cover and the reopening date agreed in writing. | Shutdown and reopening reports, check records through the winter. |
Nights, weekends and holidays: the empty site
By day a site is busy; operators, tradespeople and supervisors provide natural surveillance. When the last vehicle leaves in the evening, that surveillance vanishes. The findings reported in the Malawi study and the observation, reported by the city building department in the Florida study, that work increasingly spilling into nights, weekends and holidays made it harder to spot offenders point the same way: the security plan should be written above all for this gap.
- End-of-day protocol: the last site manager to leave walks the site with the security officer; plant keys, container locks and the fuel tank are handed over on one record.
- Public and religious holidays: no valuable deliveries just before a holiday; a list of who to call and who may enter during the break.
- Long routes: where a road or utility line stretches for kilometres, the main compound, the stores, the vehicle park and the machines scattered along the line should each get a separate check plan.
- Familiar faces: as the Florida study shows, risk can come from inside; subcontractor and supplier vehicles arriving out of hours should be logged too.
Winter shutdown: what happens when the site is empty?
In Yozgat many sites may slow down or stop entirely in winter. The site looks "closed", but plant, materials and fuel remain. We suggest planning the shutdown as a security event:
- Before shutdown, bring movable plant into the main compound or under cover, and list what stays on site.
- Remove materials that will not be needed; put the rest in locked containers.
- Plan the snow route: who clears it and how the patrol vehicle reaches the site.
- Write down what happens to lighting and cameras during a power cut; snow and ice can also strain fences and gates.
- Agree heated booths, winter clothing and rotating duties for outdoor posts before the service starts.
- At the spring reopening, take the site back on a written report and check the inventory against the shutdown list.
Common mistakes
- Leaving plant keys in the cab or in an unlocked site cabin.
- Bringing valuable materials to site weeks before they are needed.
- Leaving fuel tanks unlocked and plant tanks full at the end of the day.
- Assuming the daytime routine also works at night and over holidays.
- Agreeing the winter shutdown verbally, with no shutdown or reopening report.
- Asking security officers to keep timesheets or sign for deliveries.
- Treating cameras as the whole answer, with footage nobody watches.
Notes for operating in Türkiye
Having a private security company guard a site requires the provincial governor's permission, granted on the decision of the provincial private security commission; in Yozgat the application goes to the Governorship of Yozgat. Article 16 of Law No. 5188 confines private security staff to protection and security duties alone; receiving materials, keeping timesheets and counting stock therefore remain jobs for the contractor's own employees. Camera footage and vehicle and visitor logs are personal data and fall under Law No. 6698 on the Protection of Personal Data. If the site relocates or you add another one, ask the governorship whether the existing permit still covers it. Take advice from your own legal advisers.
Our construction site security page sets out the general framework, and our security risk assessment tool gives a first view of your site's risks.
Titan Savunma is an Ankara-based private security company licensed by the Ministry of Interior under Law No. 5188 and certified to ISO 9001, 14001, 45001, 22301 and 28000. We work with international companies in English and Turkish, and our Yozgat City Manager walks your site and prepares a duty plan for the empty hours, plant and the winter shutdown; see our page on private security in Yozgat. To discuss your site, please use our contact page.
Sources and Further Reading
- Boba, R. & Santos, R. — Single-Family Home Construction Site Theft: A Crime Prevention Case Study, International Journal of Construction Education and Research 3(3):217–236 (2007)
- Simukonda, W. & Kamwela, N. — The Management of Theft and Vandalism on Construction Jobsites in the Southern Region of Malawi, Journal of Construction Business and Management 5(1):47–59 (2021)
- Fadiya, O.O., Georgakis, P., Chinyio, E. & Akadiri, P. — Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft, Journal of Financial Management of Property and Construction 18(2):128–141 (2013)
- Edwards, D.J. & Holt, G.D. — Protecting capital investment in plant and equipment: Case study observations of post-theft recovery, Journal of Financial Management of Property and Construction 13(2):96–110 (2008)
- Sosyal Güvenlik Kurumu — SGK İstatistik Yıllığı 2025 (Sigortalı ve İşyeri İstatistikleri, Yozgat)
- Meteoroloji Genel Müdürlüğü — Resmi İstatistikler: Yozgat (1929–2025)
- 5188 sayılı Özel Güvenlik Hizmetlerine Dair Kanun — Mevzuat Bilgi Sistemi