Data Centres

Data Centre Site Selection in Turkey: Physical Risk Criteria

A framework for screening data centre sites in Turkey: seismic code and AFAD maps, flood, hazardous neighbours, access, utilities, security design and scoring.

Titan SavunmaOriginal Article: Updated: Approximately 8 min read
A security officer standing in front of a damaged industrial plant.
In This Article

This article is general information, not legal or engineering advice.

When an investor compares candidate sites for a data centre in Turkey, the physical risk questions fall into six groups: earthquake hazard and ground conditions, flood and landslide exposure, hazardous neighbours, access routes and emergency services, utility resilience, and what the site means for security design. The sensible order is to screen every candidate against official hazard data first, drop any site that fails a "knock-out" criterion, and only then pay for site-specific engineering studies on the short list. A simple weighted score keeps the comparison honest when sites are strong on some criteria and weak on others.

This framework is written for foreign investors, colocation developers and enterprise IT teams. It does not replace a structural engineer, a geotechnical survey or legal advice; it helps you ask for the right studies and read them with a security lens. Standards comparisons and construction-phase security are separate subjects.

1. Earthquake hazard: start with the official map and the code

Turkey's seismic design rules are set by the Turkish Building Earthquake Code (Türkiye Bina Deprem Yönetmeliği), published in the Official Gazette on 18 March 2018. Under its Article 5 it entered into force on 1 January 2019. The technical annex states that ground motion for design is defined by the Turkey Earthquake Hazard Maps, put into force by a 2018 Council of Ministers decision and accessible through the online application of the Disaster and Emergency Management Authority (AFAD) at tdth.afad.gov.tr. In practice, foreign investors usually obtain site-specific values through their Turkish engineering consultant.

The annex defines four earthquake ground motion levels:

  • DD-1: 2% probability of exceedance in 50 years, a return period of 2,475 years (a very rare earthquake).
  • DD-2: 10% in 50 years, a return period of 475 years (a rare earthquake).
  • DD-3: 50% in 50 years, a return period of 72 years.
  • DD-4: 68% in 50 years, a return period of 43 years.

The code also sorts buildings into use classes (Bina Kullanım Sınıfı). The highest class, BKS 1, covers buildings that must be usable immediately after an earthquake, such as hospitals, fire stations, post and other communication facilities, transport stations and terminals, and energy generation and distribution facilities, as well as buildings where valuables are stored and buildings holding hazardous materials. The list does not name data centres. Whether a particular facility falls within one of these descriptions is a question for the structural engineer and the permitting authority. Many operators simply set their own performance target above the code minimum, because a data centre that is standing but not operating has still failed its customers.

The annex also provides for site-specific ground motion spectra and site-specific soil behaviour analyses. For a data centre, ask for these on the short list, together with a geotechnical investigation, rather than relying on map values alone.

2. Regional damage, not just the building

The February 2023 earthquakes showed why a site study has to look beyond the plot boundary. The World Bank's rapid damage estimate, prepared with the Global Facility for Disaster Reduction and Recovery, found that infrastructure, including roads, power and water supply, accounted for 19% of estimated direct damage, and that five provinces accounted for 81% of the total. For a data centre, a sound building on a site whose roads, substation and water supply all fail at the same time is not resilient. That is why the next four criteria matter as much as the structure itself.

3. Flood, landslide and ground

Flood management in Turkey involves several public bodies. The General Directorate of Water Management (SYGM) of the Ministry of Agriculture and Forestry leads a World Bank-supported flood and drought management project that funds flood control works and the National Flood Forecasting and Early Warning System (TATUS), with the State Hydraulic Works (DSİ) among the implementers. For a site study, practical steps are:

  • Ask your consultant to check official flood and water-management data for the basin and any history of flooding at or near the site.
  • Look at the plot itself: low points, culverts, nearby streams and how rainwater leaves the site.
  • Commission a geotechnical investigation that covers slope stability where the land is not flat, and liquefaction where soils and groundwater suggest it.
  • Keep critical rooms such as electrical, battery and network rooms out of basements in any site with doubt about drainage.

4. Hazardous neighbours

A good plot can be compromised by what is next to it. Screen at least a few kilometres around each candidate for:

  • Major-hazard industrial establishments covered by Turkey's major-industrial-accident rules, which follow the EU Seveso approach, and chemical or fuel storage.
  • Gas transmission pipelines, LPG and fuel stations, and high-voltage lines.
  • Railway lines and roads that carry dangerous goods.
  • Airport approach paths, quarries and blasting sites.
  • Forest edges where wildfire smoke or fire could reach air intakes.
  • Venues that draw large crowds, which affect access on event days.

The output is not "near or far" but a short note per hazard: what could happen, how it could affect the site (blast, fire, toxic release, smoke, access closure) and what design or operating measure would reduce it.

5. Access routes, emergency services and utilities

A data centre needs people, fuel and spare parts to reach it on the worst day of the year. Questions to ask:

  • Are there two independent access routes, and do both depend on the same bridge or viaduct?
  • How far is the nearest fire station, and can its vehicles reach every façade?
  • Which force has jurisdiction, the police in most urban areas or the gendarmerie (jandarma) outside them, and how will you coordinate with it?
  • Can staff reach the site if public transport stops, and where will they rest during a long incident?
  • Can the utility provide supply from two separate substations, and can fibre enter by diverse routes that do not share a trench or bridge?
  • How will generator fuel be delivered if main roads are closed?

6. What the site means for security design

Site choice fixes many security options for the life of the building. A plot with room for a setback between the fence and the building allows a controlled approach and keeps vehicles away from the façade. A single vehicle entrance that can be managed, clear sight lines along the perimeter, and no neighbouring buildings overlooking yards and plant areas all make guarding simpler and more effective. A shared campus or multi-tenant business park needs a written split of who controls the outer perimeter. In Turkey, manned guarding requires a security permit from the governorship (valilik) on the decision of the provincial private security commission, under Article 3 of Law No. 5188, so the guard house, control room and patrol routes should be planned with that application in mind, not added after handover.

A scoring framework you can use

The method follows the familiar risk management sequence: identify risks for each site, analyse their likelihood and consequence, evaluate them against your criteria, and record the treatment you would need. Two rules keep it disciplined. First, set knock-out criteria in advance, for example a site inside a mapped flood area or without two viable access routes. Second, score the rest on a 1–5 scale with weights agreed before anyone visits a site. The weights below are illustrative only.

CriterionMain data sourceQuestion to scoreExample weight
Seismic hazard and groundAFAD hazard map values, site-specific study, geotechnical reportHow demanding is the design ground motion, and how good is the soil?25%
Flood and landslideOfficial water-management data, site survey, geotechnical reportIs there any credible water or slope threat to critical rooms?15%
Hazardous neighboursSite walk, zoning plans, operator enquiriesCould an accident next door stop operations?15%
Access and emergency servicesRoute survey, fire and police enquiriesCan people, fuel and parts reach the site after a regional event?15%
Utility resilienceUtility letters, fibre route mapsAre power and fibre genuinely diverse?20%
Security designPlot plan, neighbour surveyDoes the plot allow setback, one controlled entry and clear perimeter views?10%

Common mistakes: scoring before agreeing weights, treating a map value as a site study, ignoring regional infrastructure, assessing only the plot and not the neighbours, and leaving security design to the fit-out stage. For the operating phase, our article on earthquake readiness for foreign-owned facilities covers emergency preparedness.

How Titan Savunma can help

Titan Savunma is an Ankara-based private security company licensed by the Ministry of Interior under Law No. 5188, holding ISO 9001, 14001, 45001, 22301 and 28000 certificates. We work with international companies in English and Turkish and plan services for sites in different provinces with a single point of contact, written scope and regular reporting. See our data centre physical security and critical infrastructure security pages.

Sources and Further Reading

← Back to Security BulletinBack to Top
For Your Organisation

Let’s Discuss Your Security Needs

Tell us about your operations and expectations so we can define the appropriate service scope together.

Contact

Request a Security Proposal for Your Organisation

Tell us your facility type, location and general requirements. Together, we can define a service scope that suits your organisation.

Tell Us What You Need

Fields marked * are required.

What Happens Next

  1. Initial DiscussionWe respond within 15 minutes and clarify your requirements and facility details together.
  2. Service ScopeWe assess staffing needs and the working arrangements.
  3. ProposalWe prepare our proposal for the agreed service scope.

General Directorates

Ankara · Çankaya
İstanbul · Levent

Nine regional directorates · 81 provinces

Looking for a role? Visit our careers page