Data Centres

Physical Access Evidence for ISO 27001 and SOC 2 Audits

What ISO 27001 and SOC 2 auditors ask the reception and guarding team for in Turkey: visitor logs, access reviews, alarm records, sampling and KVKK retention.

Titan SavunmaOriginal Article: Updated: Approximately 8 min read
An officer seated at a desk in front of many camera screens.
In This Article

This article is general information, not legal advice.

When an ISO/IEC 27001 certification auditor or a SOC 2 service auditor looks at physical security, they rarely start with the fence. They ask for records: the list of people authorised to enter the facility, proof that the list is reviewed, visitor records, badge issue and return records, logs from controlled doors, camera retention settings and the handling of any physical security incident. Most of those records are produced or kept by the reception and guarding function. If they are incomplete, inconsistent or kept longer than Turkish data protection rules allow, the finding lands on the client, not on the guard who wrote them.

This checklist explains which controls are usually in scope, what auditors sample, how to make visitor logs and access reviews audit-ready, and how to square retention with Turkey's Personal Data Protection Law (KVKK). It is about evidence, not design; for how layered access is designed, see our earlier article on ISO 27001 layered access in data centres.

Controls in scope

ISO/IEC 27001:2022. Annex A groups physical controls under theme 7. The ones that generate most guarding evidence are physical security perimeters (7.1), physical entry (7.2), securing offices, rooms and facilities (7.3) and physical security monitoring (7.4). Which of them apply, and how, is declared in the organisation's Statement of Applicability, so that document is the first thing to read before preparing evidence.

SOC 2. SOC 2 reports use the AICPA's Trust Services Criteria. The physical access criterion is CC6.4, which deals with restricting physical access to facilities and protected information assets, such as data centre facilities and back-up media storage, to authorised personnel. Points of focus attached to the criteria are guidance, not separate requirements; the auditor tests the controls the organisation has described in its system description.

A neutral vocabulary. Many auditors also think in the terms of NIST's SP 800-53 Rev. 5 control catalogue, which is free to read. Four controls map neatly onto guarding records. PE-2 asks for a list of individuals with authorised access, credentials issued accordingly, a periodic review of the list and removal of people who no longer need access. PE-3 asks for authorisations to be verified at entry points, physical access audit logs at defined points, visitor escort and control of keys and combinations. PE-6 asks for physical access to be monitored, logs to be reviewed at a set frequency and after defined events, and results to be coordinated with incident response. PE-8 asks for visitor access records to be kept for a defined period, reviewed and anomalies reported. These are not Turkish legal requirements, but they explain clearly what "evidence of operation" means.

Evidence types and how auditors sample them

Auditors work from populations and samples. They first ask for a complete population, for example every visitor entry in the audit period, every credential issued, every leaver, every forced-door alarm. Then they pick items and trace each one through the records. The most common traces are:

  • Joiner: access request, approval by the area owner, credential issued for the approved zones only.
  • Leaver or role change: HR notification, credential disabled, physical card returned, removal visible in the next access review.
  • Visitor: pre-registration or host approval, identity check, badge issued, escort recorded, badge returned, exit time recorded.
  • Alarm or incident: alarm event in the system log, guard response recorded, outcome and any follow-up action.
  • Periodic review: the review document, who performed it, the date, and the tickets that removed unnecessary access.

Two weaknesses cause most findings. The first is an incomplete population: if the visitor register is partly on paper and partly in software, the auditor cannot be sure that the sample represents the whole. The second is a broken trace: a visitor badge issued with no exit time, or a leaver whose card was disabled in the system but never physically returned. Both are fixable by procedure, not by technology.

Visitor log quality

NIST's discussion of PE-8 lists what visitor records typically contain: the names and organisations of visitors, signatures, forms of identification, dates of access, entry and departure times, purpose of visit and the name and organisation of the person visited. Its PE-8(3) enhancement adds a principle that fits Turkish law well: limit the personal data in visitor records to the elements actually needed.

A practical standard for an audit-ready register:

  • one system of record for all entrances, or a documented daily consolidation if paper is unavoidable;
  • mandatory fields that cannot be skipped: name, company, host, zone, time in, time out, badge number, escort;
  • no free-text copies of identity documents unless a specific legal ground and purpose exist;
  • a daily end-of-shift check for open entries, with any badge not returned reported to the host and security lead;
  • corrections made by adding a dated note, never by overwriting.

Our article on reviewing visitor log data fields goes deeper into which fields to keep.

Periodic access reviews

Access reviews are where auditors most often find gaps, because they depend on people outside security. The reviewer should be the owner of each zone, not the guard force. Security's role is to produce an accurate list: current credential holders per zone, last use date, and the sponsor of each external person. The evidence pack for each review should contain the list as extracted, the reviewer's decisions, the date, and proof that removals were carried out. A review signed but not acted on is a finding in itself.

Keep the review frequency written down. Both ISO/IEC 27001 and NIST leave the frequency to the organisation, so the auditor will test against what your own policy says. For Turkish banks, the BDDK information systems regulation (Official Gazette No. 31069, 2020) expects access to secure areas to be limited to authorised staff and reviewed regularly under its physical security article, Article 17.

Retention and KVKK

Audit readiness pushes towards keeping records; data protection law pushes towards deleting them. Both can be satisfied with a written retention schedule.

  • Under Article 7 of Law No. 6698, personal data must be erased, destroyed or anonymised when the reasons for processing no longer exist. Article 12 requires appropriate technical and administrative security measures and makes the controller jointly responsible with processors, which includes a security contractor keeping the register.
  • The Regulation on the Erasure, Destruction or Anonymisation of Personal Data requires controllers that must register with the data controllers' registry (VERBİS) to prepare a storage and destruction policy (Article 5). The periodic destruction interval is set in that policy and may not exceed six months (Article 11), and records of erasure and destruction operations are kept for at least three years unless other legal obligations apply (Article 7).
  • Sector rules can set minimums. For banks, the BDDK regulation requires camera recordings of secure areas to be kept for at least one year and backed up at a separate location.

The practical answer is to define, per record type, the purpose, the retention period and the legal basis, and to make sure the audit period fits inside it. An auditor can be shown a destruction record just as easily as a log.

Pre-audit checklist

  • Statement of Applicability or SOC 2 system description read, and every physical control mapped to a named record.
  • Complete visitor population for the audit period exported from a single source.
  • All open visitor entries and unreturned badges closed or explained.
  • Latest access review for each zone signed by the zone owner, with removal tickets attached.
  • Leaver list from HR reconciled with disabled credentials and returned cards.
  • Forced-door and door-held alarms for the period exported, each with a response note.
  • Key and combination register reconciled.
  • CCTV retention setting checked against the written schedule.
  • Retention and destruction policy, and the latest destruction record, available.
  • Contract with the security provider showing data protection roles and reporting duties.

Common mistakes

  • Preparing evidence the week before the audit instead of keeping it current; auditors notice records created in batches.
  • Letting the guard force approve access; approval belongs to the zone owner.
  • Keeping photocopies of identity cards "just in case", which adds KVKK risk without helping the audit.
  • Different retention periods for the same record at different entrances.
  • Monthly reports that count visitors but never mention exceptions, the very items auditors look for.

How Titan Savunma supports audit readiness

Titan Savunma is an Ankara-based private security company licensed by the Ministry of Interior under Law No. 5188, with ISO 9001, 14001, 45001, 22301 and 28000 certificates listed on our credentials page. We work with international companies in English and Turkish, agree a written scope and reporting format at the start, and keep a single point of contact for sites in different provinces. Read more on our data centre physical security page.

Sources and Further Reading

← Back to Security BulletinBack to Top
For Your Organisation

Let’s Discuss Your Security Needs

Tell us about your operations and expectations so we can define the appropriate service scope together.

Contact

Request a Security Proposal for Your Organisation

Tell us your facility type, location and general requirements. Together, we can define a service scope that suits your organisation.

Tell Us What You Need

Fields marked * are required.

What Happens Next

  1. Initial DiscussionWe respond within 15 minutes and clarify your requirements and facility details together.
  2. Service ScopeWe assess staffing needs and the working arrangements.
  3. ProposalWe prepare our proposal for the agreed service scope.

General Directorates

Ankara · Çankaya
İstanbul · Levent

Nine regional directorates · 81 provinces

Looking for a role? Visit our careers page